A platform for research: civil engineering, architecture and urbanism
Seros hydroelectric development in Spain
Building 80,000h.p. generating station with concrete-lined canal system over 14 miles long in record time of 15 months. (Serial, 1st part) (2000 w.) (No. 54692)
Seros hydroelectric development in Spain
Building 80,000h.p. generating station with concrete-lined canal system over 14 miles long in record time of 15 months. (Serial, 1st part) (2000 w.) (No. 54692)
Seros hydroelectric development in Spain
Eng Rec
Stevens, J.C. (author)
1914
Ills.
Article (Journal)
English
© Metadata Copyright Elsevier B. V. All rights reserved.
Hydroelectric development of Duero (Spain)
Engineering Index Backfile | 1959
|Salime hydroelectric power station in Spain
Engineering Index Backfile | 1957
|Wanapum hydroelectric development
Engineering Index Backfile | 1960
|Hydroelectric development in Portugal
Engineering Index Backfile | 1954
Barrage dam of Camarasa hydroelectric plant at Noguera Pallaresa, Spain
Engineering Index Backfile | 1926
|