A platform for research: civil engineering, architecture and urbanism
Speed of drive with drilling and blasting; with aid of hewing, breaking, and digging; pile driving; and with application of freezing process.
Speed of drive with drilling and blasting; with aid of hewing, breaking, and digging; pile driving; and with application of freezing process.
The speed of driving conduits and tunnels
Die Vortriebsgeschwindigkeit im Stollen- und Tunnelbau
Randzio, H. (author)
Bautechnik ; 1
1923
10 pages
3 Figs.
Article (Journal)
German
© Metadata Copyright Elsevier B. V. All rights reserved.
New methods for construction of conduits and tunnels
Engineering Index Backfile | 1951
|Driving of tunnels at high speed
Engineering Index Backfile | 1956
|Driving of tunnels at high speed
Engineering Index Backfile | 1956
|Lining of tunnels and conduits subjected to genuine rock pressure
Engineering Index Backfile | 1950
|Considerations on flow in large pipes, conduits, tunnels, bends, and siphons
Engineering Index Backfile | 1939
|