A platform for research: civil engineering, architecture and urbanism
Describes new hydroelectric installation of Mengemor Company, of 10, 500 hp.; details of Stoney type barrage dams, tunneling work, power station, etc.; three-phase alternators producing 5000 volts stepped-up to 50,000 by transformers.
Describes new hydroelectric installation of Mengemor Company, of 10, 500 hp.; details of Stoney type barrage dams, tunneling work, power station, etc.; three-phase alternators producing 5000 volts stepped-up to 50,000 by transformers.
The Carpio Falls of the Guadalquivir
Salto de El Carpio en el Guadalquivir
Carlos Mendoza (author)
1923
5 pages
5 Figs.
Article (Journal)
Spanish
© Metadata Copyright Elsevier B. V. All rights reserved.
Online Contents | 1995
|Guadalquivir River Promenade, Cordoba
British Library Online Contents | 2005
|Entscheidungen Cordoba Kongresszentrum am Guadalquivir
British Library Online Contents | 2001
Guadalquivir reinforced-concrete bridge in seville
Engineering Index Backfile | 1931
|