A platform for research: civil engineering, architecture and urbanism
Sherman Island hydroelectric development of the International Paper Company
50,000-hp. development on Hudson River, consisting of five 10,000-hp. vertical Francis turbines to operate under 66-ft. head; power house and canal are constructed on sand underlain in many places with quicksand; dam rests on glacial deposits and is of special construction and canal, over 3500 ft. long, is concretelined.
Sherman Island hydroelectric development of the International Paper Company
50,000-hp. development on Hudson River, consisting of five 10,000-hp. vertical Francis turbines to operate under 66-ft. head; power house and canal are constructed on sand underlain in many places with quicksand; dam rests on glacial deposits and is of special construction and canal, over 3500 ft. long, is concretelined.
Sherman Island hydroelectric development of the International Paper Company
Power
Power ; 58
1923
7 pages
14 Figs.
Article (Journal)
English
© Metadata Copyright Elsevier B. V. All rights reserved.
The Sherman Island hydroelectric development of the International Paper Company
Engineering Index Backfile | 1923
|Constructing sherman island dam
Engineering Index Backfile | 1921
Dynamic Properties of Sherman Island Peat
Online Contents | 1998
|Sherman Island dam and power-house
Engineering Index Backfile | 1925
|Dynamic Properties of Sherman Island Peat
British Library Online Contents | 1998
|