A platform for research: civil engineering, architecture and urbanism
Plan adopted will provide for flood more than twice as great as that of 1921; channel through city to be relocated and retarding basin to be built upstream; cost less than damage of last flood.
Plan adopted will provide for flood more than twice as great as that of 1921; channel through city to be relocated and retarding basin to be built upstream; cost less than damage of last flood.
Flood protection adopted by Pueblo district
Eng. News-Rec.
Bock, C.A. (author)
1923
4 pages
3 Figs.
Article (Journal)
English
© Metadata Copyright Elsevier B. V. All rights reserved.
Discussion of “Flood of June, 1921, at Pueblo, Colo”
ASCE | 2021
|Flood protection of Winnipeg district
Engineering Index Backfile | 1925
|Foundations for bridges in Pueblo Flood Control Project (Colo.)
Engineering Index Backfile | 1924
Closure to “Flood of June, 1921, at Pueblo, Colo”
ASCE | 2021
|TIBKAT | 1990
|