A platform for research: civil engineering, architecture and urbanism
Concrete work done in very cold winter weather
Describes building of reinforced-concrete culvert in November and December 1922 in British Columbia, with temperature ranging from 20 deg. above zero to 53 deg. below.
Concrete work done in very cold winter weather
Describes building of reinforced-concrete culvert in November and December 1922 in British Columbia, with temperature ranging from 20 deg. above zero to 53 deg. below.
Concrete work done in very cold winter weather
Ry. Rev.
Burbank, M.A. (author)
Railway Review ; 73
1923
2 pages
3 Figs.
Article (Journal)
English
© Metadata Copyright Elsevier B. V. All rights reserved.
Engineering Index Backfile | 1912
|Engineering Index Backfile | 1938
|Engineering Index Backfile | 1938
|How new concrete work is protected during cold weather
Engineering Index Backfile | 1941
Concrete in track elevation work placed in cold weather
Engineering Index Backfile | 1931
|