A platform for research: civil engineering, architecture and urbanism
Design and construction of highway lift bridge over Mmystic river at Mystic, Conn.
Is of Brown Balance Beam type, a new type; main lift a through plate-girder span 84 ft. 8 in. center to center end bearings, resting on piers 88 ft. center to center.
Design and construction of highway lift bridge over Mmystic river at Mystic, Conn.
Is of Brown Balance Beam type, a new type; main lift a through plate-girder span 84 ft. 8 in. center to center end bearings, resting on piers 88 ft. center to center.
Design and construction of highway lift bridge over Mmystic river at Mystic, Conn.
Mun. County Eng
Grove, Wm.G. (author)
1923
3 pages
Article (Journal)
English
© Metadata Copyright Elsevier B. V. All rights reserved.
Boston's new Mystic river bridge
Engineering Index Backfile | 1949
Temporary bridge over the conecticut river at Hartford, Conn
Engineering Index Backfile | 1901
|The Middletown (conn.) bridge -- The longest highway draw span
Engineering Index Backfile | 1901
|Design and construction of highway bridge over River Meuse near Hedel
Engineering Index Backfile | 1938
|Design and construction of highway bridge over River Meuse near Hedel
Engineering Index Backfile | 1938
|