A platform for research: civil engineering, architecture and urbanism
Bridge-approach tunnel dug doorstep-to-doorstep
Illustrated description of construction of 2200 ft tunnel which will provide westbound highway connection between Harlem River Speedway and George Washington Bridge; most of buildings adjacent to tunnel had to be underpinned; excavation averaged 36 ft deep, in rock most of way; tunnel will have ceiling height of 14 ft.
Bridge-approach tunnel dug doorstep-to-doorstep
Illustrated description of construction of 2200 ft tunnel which will provide westbound highway connection between Harlem River Speedway and George Washington Bridge; most of buildings adjacent to tunnel had to be underpinned; excavation averaged 36 ft deep, in rock most of way; tunnel will have ceiling height of 14 ft.
Bridge-approach tunnel dug doorstep-to-doorstep
Eng News-Rec
Sullivan, R.J.O. (author)
Engineering News-Record ; 145
1950
2 pages
Article (Journal)
English
© Metadata Copyright Elsevier B. V. All rights reserved.
DOORSTEP SEAL AS WELL AS DOOR PROVIDED WITH THE DOORSTEP SEAL
European Patent Office | 2018
|Lynch Architects - Rooftop, Townhouse, Doorstep, Sidewalk, Urban Block
Online Contents | 2011
People & Ideas: The rain-forest on our doorstep
British Library Online Contents | 1996
|EVALUATIONS -- Learning the lessons from Doorstep Greens and People's Places
Online Contents | 2006
Gas Forum lists best practice guidelines for doorstep selling
Online Contents | 1997