A platform for research: civil engineering, architecture and urbanism
Cracks of concrete roof, walls and pavement in twin vehicular tunnel necessitated relining with 3-gage Armco corrugated steel plates, filling voids behind walls as well as between walls and steel liner and placing gunite concrete lining over steel plates; drain pipes were inserted into 2 in. holes; in north tube, 80 ft section of ceiling which was too low was replaced with H beams encased by 2 ft concrete.
Cracks of concrete roof, walls and pavement in twin vehicular tunnel necessitated relining with 3-gage Armco corrugated steel plates, filling voids behind walls as well as between walls and steel liner and placing gunite concrete lining over steel plates; drain pipes were inserted into 2 in. holes; in north tube, 80 ft section of ceiling which was too low was replaced with H beams encased by 2 ft concrete.
Repairing missionary ridge tunnel
Pub Works
Hoge, L.P. (author)
Public Works ; 81
1950
2 pages
Article (Journal)
English
© Metadata Copyright Elsevier B. V. All rights reserved.
Missionary Ridge Wildfire Rehabilitation
ASCE | 2005
|Missionary Ridge Wildfire Rehabilitation
British Library Conference Proceedings | 2005
|Missionary Ridge Wildfire Rehabilitation
British Library Conference Proceedings | 2005
|Missionary Ridge Fire Cost Assessment
British Library Online Contents | 2007
|Fractured ridge repairing structure and repairing method thereof
European Patent Office | 2023
|