A platform for research: civil engineering, architecture and urbanism
Illustrated description of 9 mi embankment among Texas gulf coast, between Freeport and the sea; levee embankment is 18 ft above sea level with 40 ft crown, 5:1 slope on gulf side and 4:1 slope on land side; width is 175 ft at base; amount of material excavated for embankment totals 2,072,000 cu yd; six draglines and two dozers are handling excavating job in three 8 hr shifts; data on flood control gates.
Illustrated description of 9 mi embankment among Texas gulf coast, between Freeport and the sea; levee embankment is 18 ft above sea level with 40 ft crown, 5:1 slope on gulf side and 4:1 slope on land side; width is 175 ft at base; amount of material excavated for embankment totals 2,072,000 cu yd; six draglines and two dozers are handling excavating job in three 8 hr shifts; data on flood control gates.
Building sea wall in Texas
Excavating Engr
London, E.F. (author)
Excavating Engineer ; 44
1950
Article (Journal)
English
© Metadata Copyright Elsevier B. V. All rights reserved.
Unit wall concrete building construction, fort Crockett, Texas
Engineering Index Backfile | 1912
|Perlstein building fire, Beaumont, Texas
Engineering Index Backfile | 1944
|Architecture and Art Building, Texas
British Library Online Contents | 2006
|Tests on Texas building stones
Engineering Index Backfile | 1905
|Best High-Rise Texas Association of Counties Office Building, Austin, Texas
British Library Online Contents | 2004