A platform for research: civil engineering, architecture and urbanism
US 90, East Texas -- Case study in roadway modernization
Description of widening and resurfacing project 12.8 mi in length in Jefferson County, Tex, involved unusual 4-course hot mix construction as solution to extremely severe traffic, soil and moisture conditions; notes on two other U S 90 projects included.
US 90, East Texas -- Case study in roadway modernization
Description of widening and resurfacing project 12.8 mi in length in Jefferson County, Tex, involved unusual 4-course hot mix construction as solution to extremely severe traffic, soil and moisture conditions; notes on two other U S 90 projects included.
US 90, East Texas -- Case study in roadway modernization
Roads Streets
Killmer, R.E. (author)
Roads and Streets ; 93
1950
Article (Journal)
English
© Metadata Copyright Elsevier B. V. All rights reserved.
Texas problems and methods of road modernization
Engineering Index Backfile | 1950
|Modernization of the Port of Texas City
British Library Conference Proceedings | 1995
|Modernization of four east river bridges
Engineering Index Backfile | 1963
|