A platform for research: civil engineering, architecture and urbanism
Construction of 33 mi of 20-in. for Texas Eastern Transmission Corp; in crossing several swamps, longest being 11,000 ft, pipe was floated, with ditch filled with water to depth of about 2 ft; use of portable steel bridges for transporting mobile equipment over drainage canals; structures are 100% recoverable; they can be more quickly erected at lower cost than temporary wooden bridges which have been customary for swamp operations.
Construction of 33 mi of 20-in. for Texas Eastern Transmission Corp; in crossing several swamps, longest being 11,000 ft, pipe was floated, with ditch filled with water to depth of about 2 ft; use of portable steel bridges for transporting mobile equipment over drainage canals; structures are 100% recoverable; they can be more quickly erected at lower cost than temporary wooden bridges which have been customary for swamp operations.
Pipe lining on Gulf Coast
Oil Gas J
Reed, P. (author)
Oil and Gas Journal ; 49
1950
Article (Journal)
English
© Metadata Copyright Elsevier B. V. All rights reserved.
Springer Verlag | 2021
|British Library Online Contents | 2006
|