A platform for research: civil engineering, architecture and urbanism
Asphalt underseal rehabilitates canal
In repairing lining of section of Yakima Ridge canal, holes were drilled not less than 18 in. from joints or cracks, with additional holes in center of panels; cavities under lining were filled with soil cement; asphalt was injected by asphalt gun; 1100 gal applied in 30 min; cost of material and its application averaged $1. 33 per sq yd; drilling and preparation of lining is estimated at approximately 5¢ per sq yd.
Asphalt underseal rehabilitates canal
In repairing lining of section of Yakima Ridge canal, holes were drilled not less than 18 in. from joints or cracks, with additional holes in center of panels; cavities under lining were filled with soil cement; asphalt was injected by asphalt gun; 1100 gal applied in 30 min; cost of material and its application averaged $1. 33 per sq yd; drilling and preparation of lining is estimated at approximately 5¢ per sq yd.
Asphalt underseal rehabilitates canal
Eng News-Rec
Benson, J.R. (author) / Ellsperman, L.M. (author)
Engineering News-Record ; 145
1950
2 pages
Article (Journal)
English
© Metadata Copyright Elsevier B. V. All rights reserved.
Company rehabilitates entire system
Engineering Index Backfile | 1931
Iron lining rehabilitates sewer
Engineering Index Backfile | 1941
|Challenging Change: NYPA Rehabilitates Robert Moses
Online Contents | 1998
|Illinois rehabilitates for war
Engineering Index Backfile | 1943
Morocco rehabilitates its rail network
British Library Online Contents | 1997