A platform for research: civil engineering, architecture and urbanism
Factors influencing hydroelectric development; plan provides for seven dams across Missouri river proper, all with power plants; one of these dams is built, four are under construction and two are in active planning stage; future total capacity up to 1,665,000 kw; construction stages illustrated.
Factors influencing hydroelectric development; plan provides for seven dams across Missouri river proper, all with power plants; one of these dams is built, four are under construction and two are in active planning stage; future total capacity up to 1,665,000 kw; construction stages illustrated.
Missouri River basin
Water Power
Baumhoff, R.G. (author)
Water Power ; 2
1950
10 pages
Article (Journal)
English
© Metadata Copyright Elsevier B. V. All rights reserved.
Missouri River Basin Development
Wiley | 1955
|Missouri River Basin Plan in Operation
ASCE | 2021
|Initial Missouri River Basin construction ready to start
Engineering Index Backfile | 1945
Regulated Missouri River basin assures dependable water supplies
Engineering Index Backfile | 1956
Effects of Missouri River Basin Control on Water Quality
Wiley | 1958
|