A platform for research: civil engineering, architecture and urbanism
Water and industrialisation
Doornpoort Dam being erected in Witbank area for 82,000 cu secs maximum flood; three stages of 57, 75 and 150-ft dam in height planned; final potential will be 15 mgd; it may possibly cause oil from coal plant to be erected in area.
Water and industrialisation
Doornpoort Dam being erected in Witbank area for 82,000 cu secs maximum flood; three stages of 57, 75 and 150-ft dam in height planned; final potential will be 15 mgd; it may possibly cause oil from coal plant to be erected in area.
Water and industrialisation
South African Min Eng J
1950
3 pages
Article (Journal)
English
© Metadata Copyright Elsevier B. V. All rights reserved.
De-industrialisation and new industrialisation in Britain and Germany
Online Contents | 1994
|Industrialisation and the brick
TIBKAT | 1965
|Rural industrialisation in Ethiopia
Elsevier | 1988
|3.2. De-industrialisation and restructuring
Online Contents | 1998
Conception architecturale industrialisation ouverte informatique
UB Braunschweig | 1981
|