A platform for research: civil engineering, architecture and urbanism
Forty-year-old Wilbur hydro project rejuvenated
Addition of project increases total plant capacity to 11,000 kw; development since 1910; damages caused by floods in 1940 and repair work; generator is rated at 7000 kw, 7777 kva, 0.9 power factor and 2300 v; dam was raised by 7 ft; spillway is 185 ft long and consists of four 40 × 15-ft Tainter gates; spillway will pass maximum 36,000 cfs.
Forty-year-old Wilbur hydro project rejuvenated
Addition of project increases total plant capacity to 11,000 kw; development since 1910; damages caused by floods in 1940 and repair work; generator is rated at 7000 kw, 7777 kva, 0.9 power factor and 2300 v; dam was raised by 7 ft; spillway is 185 ft long and consists of four 40 × 15-ft Tainter gates; spillway will pass maximum 36,000 cfs.
Forty-year-old Wilbur hydro project rejuvenated
Civ Eng (NY)
Mattern, D.H. (author)
1951
6 pages
Illustrations
Article (Journal)
English
© Metadata Copyright Elsevier B. V. All rights reserved.
Engineering Index Backfile | 1955
Engineering Index Backfile | 1908
|Cleveland's Rejuvenated Neighborhoods
British Library Online Contents | 1996
|Engineering Index Backfile | 1922
|