A platform for research: civil engineering, architecture and urbanism
New Underground Railway for Budapest
East-West line will be 5 mi long, with eight stations; expected to be opened in 1954; two tracks will be in separate tunnels, 5 m in diam; about 450 m of tunnel will lie beneath Danube River; stations will be similar to those of Moscow underground railway.
New Underground Railway for Budapest
East-West line will be 5 mi long, with eight stations; expected to be opened in 1954; two tracks will be in separate tunnels, 5 m in diam; about 450 m of tunnel will lie beneath Danube River; stations will be similar to those of Moscow underground railway.
New Underground Railway for Budapest
Engineering
Engineering ; 170
1950
Article (Journal)
English
© Metadata Copyright Elsevier B. V. All rights reserved.
The underground railway at Budapest
Engineering Index Backfile | 1897
Engineering Index Backfile | 1896
|The electric underground road in Budapest
Engineering Index Backfile | 1896
|