A platform for research: civil engineering, architecture and urbanism
Yonge-street subway, Toronto
Subway, to be in operation at end of 1953, will have length of 4.75 mi; structure consists of reinforced concrete box section, 17 ft 7 5/ 8 in. deep and 32 ft 6 in. wide oa; two track tunnels each 13 ft 6 in. wide by 13 ft high; construction details. See also Engineering Index 1950 p 1164.
Yonge-street subway, Toronto
Subway, to be in operation at end of 1953, will have length of 4.75 mi; structure consists of reinforced concrete box section, 17 ft 7 5/ 8 in. deep and 32 ft 6 in. wide oa; two track tunnels each 13 ft 6 in. wide by 13 ft high; construction details. See also Engineering Index 1950 p 1164.
Yonge-street subway, Toronto
Engineering
Engineering ; 171
1951
2 pages
Illustrations
Article (Journal)
English
© Metadata Copyright Elsevier B. V. All rights reserved.
Construction of yonge street subway
Engineering Index Backfile | 1929
|PETE AND JOEY DO TORONTO The Yonge Street `Seen' Scene
British Library Conference Proceedings | 2001
|TR-135 ANALYSIS OF LAND USE IMPACTS OF THE YONGE AND UNIVERSITY SUBWAY LINES IN TORONTO
British Library Conference Proceedings | 2002
|The Heart of Toronto: Corporate Power, Civic Activism, and the Remaking of Downtown Yonge Street
Taylor & Francis Verlag | 2024
|British Library Online Contents | 2014
|