A platform for research: civil engineering, architecture and urbanism
Use prepacked concrete in Whittier narrows dam
Data on prepakt concrete foundation slab for spillway structure; prepacked coarse aggregates are placed in lifts in base slab 8 ft thick and 530 ft long; prepacked slab contains mats of reinforcing steel on 6- and 12-in. centers at top and bottom; grouting pipes, steel, and aggregates are placed at same time and aggregates are kept wet for 24 hr before intrusion.
Use prepacked concrete in Whittier narrows dam
Data on prepakt concrete foundation slab for spillway structure; prepacked coarse aggregates are placed in lifts in base slab 8 ft thick and 530 ft long; prepacked slab contains mats of reinforcing steel on 6- and 12-in. centers at top and bottom; grouting pipes, steel, and aggregates are placed at same time and aggregates are kept wet for 24 hr before intrusion.
Use prepacked concrete in Whittier narrows dam
Pit Quarry
Utley, H.F. (author)
Pit and Quarry ; 44
1951
Article (Journal)
English
© Metadata Copyright Elsevier B. V. All rights reserved.
Response of Two Dams in the 1987 Whittier Narrows Earthquake 3.29
British Library Conference Proceedings | 1993
|Strengths of prepacked concrete and reinforced prepacked concrete beams
Engineering Index Backfile | 1967
|Evaluation of Safety Against Erosion & Piping at Whittier Narrows Dam in California
British Library Conference Proceedings | 1999
|