A platform for research: civil engineering, architecture and urbanism
Pre-placed aggregate for spillway grouted to form "prepakt" concrete
Prepakt concrete foundation slab consists of three monoliths each 180 ft long, 110 ft wide and 8 ft thick; illustrated description of placing layers of aggregate and grouting them to consolidate foundation slab which supports spillway gate pier. (See also Western Construction v 26 n 7 July 1951 p 69-72)
Pre-placed aggregate for spillway grouted to form "prepakt" concrete
Prepakt concrete foundation slab consists of three monoliths each 180 ft long, 110 ft wide and 8 ft thick; illustrated description of placing layers of aggregate and grouting them to consolidate foundation slab which supports spillway gate pier. (See also Western Construction v 26 n 7 July 1951 p 69-72)
Pre-placed aggregate for spillway grouted to form "prepakt" concrete
Eng News-Rec
Engineering News-Record ; 147
1951
4 pages
Article (Journal)
English
© Metadata Copyright Elsevier B. V. All rights reserved.
Pre-placed aggregate for spillway grouted to form "prepakt" concrete
Engineering Index Backfile | 1951
Grout composition for pre-placed aggregate concrete and pre-placed aggregate concrete using the same
European Patent Office | 2019
|Engineering Index Backfile | 1968
Prototype Experiment on Asphalt Grouted Placed Block Revetment
British Library Conference Proceedings | 2003
|Engineering Index Backfile | 1956