A platform for research: civil engineering, architecture and urbanism
They scalped a mountainside to build new Pittsburgh expressway link
Shelf roadway entailed unusual problems of location, design and construction control by Pennsylvania highway department; construction company employed nine shovels to move 1,250,000 cu yd excavation in 1.08-mi of line; description of slope adjusting, blasting requirement, etc; cross section, showing borings and details of slope and slope drainage for one of deeper cuts.
They scalped a mountainside to build new Pittsburgh expressway link
Shelf roadway entailed unusual problems of location, design and construction control by Pennsylvania highway department; construction company employed nine shovels to move 1,250,000 cu yd excavation in 1.08-mi of line; description of slope adjusting, blasting requirement, etc; cross section, showing borings and details of slope and slope drainage for one of deeper cuts.
They scalped a mountainside to build new Pittsburgh expressway link
Roads Streets
Roads and Streets ; 93
1950
Article (Journal)
English
© Metadata Copyright Elsevier B. V. All rights reserved.
British Library Conference Proceedings | 2001
|Mountainside quarry supplies rock for "Yosemite" cement
Engineering Index Backfile | 1928
|Expressway construction progress in American cities -- Pittsburgh
Engineering Index Backfile | 1949
|Partially overlapped mountainside separated roadbed structure on plane
European Patent Office | 2022
|