A platform for research: civil engineering, architecture and urbanism
How Kansas built concrete test pavement
First three test roads, had total length of 23 1/4 mi of 24 and 22-ft pavement; second three projects were 13 mi long; data on road construction and compacted granular subbase; concrete saw cut three-fourths of 2×1/8-in. construction joints; expansion joints spaced at 500 ft were filled with 7/8-in. surfaced redwood.
How Kansas built concrete test pavement
First three test roads, had total length of 23 1/4 mi of 24 and 22-ft pavement; second three projects were 13 mi long; data on road construction and compacted granular subbase; concrete saw cut three-fourths of 2×1/8-in. construction joints; expansion joints spaced at 500 ft were filled with 7/8-in. surfaced redwood.
How Kansas built concrete test pavement
Eng News Rec
Engineering News-Record ; 146
1951
4 pages
Article (Journal)
English
© Metadata Copyright Elsevier B. V. All rights reserved.
Track built on concrete base in Kansas City
Engineering Index Backfile | 1922
|Kansas Tire/Pavement Noise Study
NTIS | 2005
|Construction and Performance of a Fast-Track Concrete Pavement in Kansas
British Library Online Contents | 1994
|Airfield Pavement Evaluation, Usnas Olathe, Kansas
NTIS | 1969
|Two-course reinforced concrete pavement built without forms
Engineering Index Backfile | 1964