A platform for research: civil engineering, architecture and urbanism
Scrapers mingle with city traffic in 650,000 yd road raising and hill job at Cincinnati
Double-shift earthmoving schedule, with time out for rush hour traffic employed by contractors on Beechmont Avenue Extension project; new high-level flood levee to carry SR 74 and 125 and suburban traffic past Lunken airport, described; general plan and profile of extension; cross section of old and new flood levee.
Scrapers mingle with city traffic in 650,000 yd road raising and hill job at Cincinnati
Double-shift earthmoving schedule, with time out for rush hour traffic employed by contractors on Beechmont Avenue Extension project; new high-level flood levee to carry SR 74 and 125 and suburban traffic past Lunken airport, described; general plan and profile of extension; cross section of old and new flood levee.
Scrapers mingle with city traffic in 650,000 yd road raising and hill job at Cincinnati
Roads Streets
Roads and Streets ; 94
1951
3 pages
Article (Journal)
English
© Metadata Copyright Elsevier B. V. All rights reserved.
Engineering Index Backfile | 1904
|Engineering Index Backfile | 1935
|ASCE | 2020
|British Library Conference Proceedings | 1994
|Engineering Index Backfile | 1955
|