A platform for research: civil engineering, architecture and urbanism
How Rock Island cutoff speeds transcontinental traffic
New line at Denver avoids city congestion and speeds interchange of freight with Denver and Rio Grande Western; project involves construction of 4.31 mi of single track line, rehabilitation of portion of Northwestern Terminal trackage, construction of passing track about 3500 ft long at connection with Union Pacific, and installation of automatic block signals; description of bridges; 358,000 cu yd of grading involved.
How Rock Island cutoff speeds transcontinental traffic
New line at Denver avoids city congestion and speeds interchange of freight with Denver and Rio Grande Western; project involves construction of 4.31 mi of single track line, rehabilitation of portion of Northwestern Terminal trackage, construction of passing track about 3500 ft long at connection with Union Pacific, and installation of automatic block signals; description of bridges; 358,000 cu yd of grading involved.
How Rock Island cutoff speeds transcontinental traffic
Ry Age
Railway Age ; 131
1951
3 pages
Article (Journal)
English
© Metadata Copyright Elsevier B. V. All rights reserved.
Transcontinental crosses 40 rivers
Engineering Index Backfile | 1950
|National transcontinental railway bridges
Engineering Index Backfile | 1915
|Great Northern gets first postwar transcontinental streamliners
Engineering Index Backfile | 1947
Uniting the States: The First Transcontinental Railroad
ASCE | 2016
|