A platform for research: civil engineering, architecture and urbanism
Economy achieved by driving only every second or third pile to depth required; this did not reduce stability because of distribution of force.
Economy achieved by driving only every second or third pile to depth required; this did not reduce stability because of distribution of force.
Economical sheet piles constructed for stabilizing of quay wall in port of Hamburg, Germany
Sparsame aufgeloeste Spundwaende
Bauingenieur ; 25
1950
2 pages
Article (Journal)
German
© Metadata Copyright Elsevier B. V. All rights reserved.
Engineering Index Backfile | 1931
|Quay wall in reinforced concrete piles and sheet piles at Kenitra, Morocco
Engineering Index Backfile | 1920
Construction of heavy quay wall of steel concrete with peiner box sheet piles, in Kiel, Germany
Engineering Index Backfile | 1954
|The Development of Quay-Cranes in the Port of Hamburg
ASCE | 2021
|Reconstruction and strengthening of quay walls in Hamburg, Germany
Engineering Index Backfile | 1951
|