A platform for research: civil engineering, architecture and urbanism
Construction of large jetty on southampton water
Illustrated data on equipment used for construction of 2470 ft jetty for new refinery at Fawley; description of concrete plant including two floating mixing plants; foundation carried out with 14 × 16 in. piles, 55 to 85 ft long, weighing up to 9 tons each, and 32 in. diam. precast hollow piles 75 to 90 ft, weighing up to 18 tons each; hammers weighed four to 8 1/2 tons; data on caissons and precast frames.
Construction of large jetty on southampton water
Illustrated data on equipment used for construction of 2470 ft jetty for new refinery at Fawley; description of concrete plant including two floating mixing plants; foundation carried out with 14 × 16 in. piles, 55 to 85 ft long, weighing up to 9 tons each, and 32 in. diam. precast hollow piles 75 to 90 ft, weighing up to 18 tons each; hammers weighed four to 8 1/2 tons; data on caissons and precast frames.
Construction of large jetty on southampton water
Concrete Constr Eng
1951
11 pages
Article (Journal)
English
© Metadata Copyright Elsevier B. V. All rights reserved.
Large jetty on southampton water
Engineering Index Backfile | 1951
Engineering Index Backfile | 1948
|Design and construction of Erith jetty
Engineering Index Backfile | 1961
|Tidal Inlet Response to Jetty Construction
NTIS | 1981
|Channel Entrance Response to Jetty Construction
NTIS | 1975
|