A platform for research: civil engineering, architecture and urbanism
Design and construction of 656 Mva Mexican hydroelectric power project on Balsas River; economics, siting of project, design of rockfill dam, and geology of site; diversion and spillway arrangements, construction of underground power plant and tunnels; underground concreting, production of aggregate and concrete, excavation of spillway tunnels, construction of dam and mechanical and electrical equipment are discussed. (n 5 May 1965 p 198-205, n 6 June p 217-24)
Design and construction of 656 Mva Mexican hydroelectric power project on Balsas River; economics, siting of project, design of rockfill dam, and geology of site; diversion and spillway arrangements, construction of underground power plant and tunnels; underground concreting, production of aggregate and concrete, excavation of spillway tunnels, construction of dam and mechanical and electrical equipment are discussed. (n 5 May 1965 p 198-205, n 6 June p 217-24)
Infiernillo
Water Power
Barocio, A.J. (author)
Water Power ; 17
1965
6 pages
Article (Journal)
English
© Metadata Copyright Elsevier B. V. All rights reserved.
Infiernillo: Flood safety analysis
Online Contents | 1996
Dynamic analysis of El Infiernillo rockfill dam
British Library Conference Proceedings | 2004
|Static and dynamic coupled Analyses of El Infiernillo Dam
British Library Conference Proceedings | 1993
|British Library Conference Proceedings | 1993
|