1300-ton capacity prestressed anchors stabilize dam
Wanapum hydro power plant on Columbia River provides for ten installed and six future generating units; to reduce initial outlay, construction of monoliths for these six units was limited to intakes; intakes lacked stability; tying them down to rock foundation with prestressed anchors was practical and most economical solution; 13 anchors, each of nearly 1300-ton capacity and 70 ft deep, were required for each monolith, using conventional 45° wedge theory; each anchor consisted of four BBRV type cables, each cable containing 90 1/4 in. -diam parallel high-strength steel wires with cold formed button head ends and perforated steel anchor heads.
1300-ton capacity prestressed anchors stabilize dam
Wanapum hydro power plant on Columbia River provides for ten installed and six future generating units; to reduce initial outlay, construction of monoliths for these six units was limited to intakes; intakes lacked stability; tying them down to rock foundation with prestressed anchors was practical and most economical solution; 13 anchors, each of nearly 1300-ton capacity and 70 ft deep, were required for each monolith, using conventional 45° wedge theory; each anchor consisted of four BBRV type cables, each cable containing 90 1/4 in. -diam parallel high-strength steel wires with cold formed button head ends and perforated steel anchor heads.
1300-ton capacity prestressed anchors stabilize dam
Prestressed Concrete Inst -- J
Eberhardt, A. (author) / Veltrop, J.A. (author)
1965
36 pages
Article (Journal)
English
© Metadata Copyright Elsevier B. V. All rights reserved.
Engineering Index Backfile | 1962
|Driven Anchors to Stabilize Colluvial Slopes
NTIS | 1984
|Influence of shear strength of joints on design of prestressed anchors to stabilize rock slope
Engineering Index Backfile | 1967
|