Long intake, tailrace add 25 ft to hydro plants available head
Construction of 11/2 mi intake and 41/2 mi discharge by Alabama Power Co to obtain maximum use of water flow at Jordan Lake; construction is said to aid navigation; how project involves use of heavy equipment, including special dredge, and building of levees under difficult soil conditions.
Long intake, tailrace add 25 ft to hydro plants available head
Construction of 11/2 mi intake and 41/2 mi discharge by Alabama Power Co to obtain maximum use of water flow at Jordan Lake; construction is said to aid navigation; how project involves use of heavy equipment, including special dredge, and building of levees under difficult soil conditions.
Long intake, tailrace add 25 ft to hydro plants available head
Elec World
Wingate, F.B. (author)
Electrical World ; 165
1966
2 pages
Article (Journal)
English
© Metadata Copyright Elsevier B. V. All rights reserved.
Transient stability of a hydro-turbine governing system with different tailrace tunnels
Taylor & Francis Verlag | 2020
|New design of tailrace conduits of hydropower plants
Springer Verlag | 1985
|New design of tailrace conduits of hydropower plants
Online Contents | 1985
|Reinforcement of spillway tailrace
Engineering Index Backfile | 1966
|