A platform for research: civil engineering, architecture and urbanism
Hydro project formulation -- Results in southeast
Major feature of paper concerns concepts involved in hydro power project formulation in United States; to determine whether power facilities should be included in water resource project, tests are applied to ascertain economic and financial feasibility; application of these concepts or corresponding ones used earlier has resulted in authorization of power facilities in southeast, capacity of which totals 1,647,000 kw with average annual output of 3,875,000,000.
Hydro project formulation -- Results in southeast
Major feature of paper concerns concepts involved in hydro power project formulation in United States; to determine whether power facilities should be included in water resource project, tests are applied to ascertain economic and financial feasibility; application of these concepts or corresponding ones used earlier has resulted in authorization of power facilities in southeast, capacity of which totals 1,647,000 kw with average annual output of 3,875,000,000.
Hydro project formulation -- Results in southeast
ASCE -- Proc (J Power Div)
Weinkauff, H.C.C. (author) / Lindner, C.P. (author)
1966
13 pages
Article (Journal)
English
© Metadata Copyright Elsevier B. V. All rights reserved.
Hydro-electric power in southeast
Engineering Index Backfile | 1956
|SMALL HYDRO - Small Hydro Project Focus
Online Contents | 2000
Renewed interest in small hydro in southeast Venezuela
Online Contents | 1997
|Engineering Index Backfile | 1968
|Another Benefit of Hydro: Offering Hydro Project Tours
Online Contents | 2011