A platform for research: civil engineering, architecture and urbanism
"Sectra" thermo-formwork
Portal-type steel formwork with all three members articulated by means of vertical jacks and horizontal draw bar is 1.49 m long, 2.50 m high, up to 5.70 m wide, and moves on preinstalled runways; concrete setting is accelerated by means of hot water coils incorporated into formwork panels and fed from portable boiler unit; 13-story building comprising 64 apartments was built in 26 days and was ready for occupancy in 17 wk after completion of foundation work.
"Sectra" thermo-formwork
Portal-type steel formwork with all three members articulated by means of vertical jacks and horizontal draw bar is 1.49 m long, 2.50 m high, up to 5.70 m wide, and moves on preinstalled runways; concrete setting is accelerated by means of hot water coils incorporated into formwork panels and fed from portable boiler unit; 13-story building comprising 64 apartments was built in 26 days and was ready for occupancy in 17 wk after completion of foundation work.
"Sectra" thermo-formwork
Le thermo-coffrage Sectra
Construction ; 20
1965
3 pages
Article (Journal)
English
© Metadata Copyright Elsevier B. V. All rights reserved.
Reversible, thermo-acoustic panel for reversible, variable-geometry formwork
European Patent Office | 2017
|REVERSIBLE, THERMO-ACOUSTIC PANEL FOR REVERSIBLE, VARIABLE-GEOMETRY FORMWORK
European Patent Office | 2021
|FORMWORK - Rationalising Formwork
Online Contents | 1998
|