A platform for research: civil engineering, architecture and urbanism
Jacks placed in steel top section of California building pulled ten floors into place from ground level assembly station; hanger straps anchored to roof structure picked up all building loads and transfered them to slip formed concrete core complex; new method saved both time and money, and produced building of unusual stability in earthquakes; cost, construction, design, equipment and foundation details.
Jacks placed in steel top section of California building pulled ten floors into place from ground level assembly station; hanger straps anchored to roof structure picked up all building loads and transfered them to slip formed concrete core complex; new method saved both time and money, and produced building of unusual stability in earthquakes; cost, construction, design, equipment and foundation details.
Bootstrap jacking raises floors and finish materials
Construction Methods Equipment
Lamb, B. (author)
1965
3 pages
Article (Journal)
English
© Metadata Copyright Elsevier B. V. All rights reserved.
Bootstrap jacking rigs raise bridge
Engineering Index Backfile | 1943
Cement or granolithic finish on concrete floors
Engineering Index Backfile | 1922
|An experimental robot is being used to finish and grind floors.
Online Contents | 1994
British Library Online Contents | 2006
|Building jacking system and jacking method of building jacking system
European Patent Office | 2015
|