A platform for research: civil engineering, architecture and urbanism
Louisville Bridge erection
Successive stages of work were operated simultaneously on sets of three 245-ft. deck spans. Old piers were remodeled and spans were replaced under traffic.
Louisville Bridge erection
Successive stages of work were operated simultaneously on sets of three 245-ft. deck spans. Old piers were remodeled and spans were replaced under traffic.
Louisville Bridge erection
Contracting
Contracting ; 9
1919
2 pages
2 Figs.
Article (Journal)
English
© Metadata Copyright Elsevier B. V. All rights reserved.
Maintaining traffic during erection of Louisville bridge
Engineering Index Backfile | 1919
Engineering Index Backfile | 1898
|Erection of Columbia River Bridge erection
Engineering Index Backfile | 1894
Engineering Index Backfile | 1933
|BRIDGE ERECTION METHOD AND LAUNCHING MACHINE FOR BRIDGE ERECTION
European Patent Office | 2022
|