Tunnel, to divert water from Trinity Reservoir to Clear Creek power plant, is 11 mi long, 20 ft diam and concrete lined; tunneling at rate of 40 to 50 ft per day; 850 cu fpm capacity air compressors supplied 100- to 120-lb pressure; 3 lb of explosives needed to break 1 cu yd of material; use of jumbo and mucking operations are described.
Tunnel, to divert water from Trinity Reservoir to Clear Creek power plant, is 11 mi long, 20 ft diam and concrete lined; tunneling at rate of 40 to 50 ft per day; 850 cu fpm capacity air compressors supplied 100- to 120-lb pressure; 3 lb of explosives needed to break 1 cu yd of material; use of jumbo and mucking operations are described.
Driving clear creek tunnel
Explosives Engr
Behme, R.L. (author)
Explosives Engineer ; 36
1958
6 pages
Article (Journal)
English
© Metadata Copyright Elsevier B. V. All rights reserved.
Evaluation of Concrete Lining, Clear Creek Power Tunnel
NTIS | 1964
|Movement history of the Clear Creek Forks landslide, Clear Creek County, Colorado
British Library Conference Proceedings | 1998
|Engineering Index Backfile | 1946
|The Clear Creek Hydrologic/Environmental Observatory
British Library Conference Proceedings | 2007
|Dam Safety Modification for Clear Creek Dam
British Library Conference Proceedings | 1993
|