A platform for research: civil engineering, architecture and urbanism
Rendsburg road tunnel
Bottleneck in long distance traffic between German Federal Republic and Denmark is being removed by construction of tunnel under Nord-Ostsee Canal at Rendsburg; it is reinforced concrete structure of rectangular cross section comprising approaches and 140 m long twin tube central section across canal itself.
Rendsburg road tunnel
Bottleneck in long distance traffic between German Federal Republic and Denmark is being removed by construction of tunnel under Nord-Ostsee Canal at Rendsburg; it is reinforced concrete structure of rectangular cross section comprising approaches and 140 m long twin tube central section across canal itself.
Sealing methods at Rendsburg vehicular tunnel
Engineering Index Backfile | 1961
|On-site measurements made on Rendsburg street tunnel
Engineering Index Backfile | 1966
|UB Braunschweig | 1982
|