A platform for research: civil engineering, architecture and urbanism
Picturesqueness marks Venezuela's 300-MW Tacoa steam plant
320,000-kw plant will ultimately consist of two 40,000-kw units and four 60,000 kw units; features of two 40,000 kw units placed in operation, including semi-outdoor boilers, centralized control room for six units, graphic instrument control, intake and discharge canals, steel "H" concrete encased piling and cathodic protection of all piling and salt water equipment; equipment data.
Picturesqueness marks Venezuela's 300-MW Tacoa steam plant
320,000-kw plant will ultimately consist of two 40,000-kw units and four 60,000 kw units; features of two 40,000 kw units placed in operation, including semi-outdoor boilers, centralized control room for six units, graphic instrument control, intake and discharge canals, steel "H" concrete encased piling and cathodic protection of all piling and salt water equipment; equipment data.
Picturesqueness marks Venezuela's 300-MW Tacoa steam plant
Elec Light Power
Gamble, R.A. (author) / Bonnes, F.X. (author)
1958
4 pages
Article (Journal)
English
© Metadata Copyright Elsevier B. V. All rights reserved.
Venezuela's New Socialist Cities
British Library Online Contents | 2008
|Wiley | 1971
|Bridge structures in Venezuela's Mountains
Engineering Index Backfile | 1954
Venezuela's experience with CFRD construction
Online Contents | 2008
|RCC TECHNOLOGY - Puerto Maya: Venezuela's first RCC dam
Online Contents | 1999
|