A platform for research: civil engineering, architecture and urbanism
Civil engineering works for power plant at Beautor
Report on completion of foundation works and construction of plant buildings; use of piles of 420, 560, 1,060 and 1,550 mm diam; rotation and percussion borings; "inverse circulation" method; total of 1080 piles used of 17.152 m total length. See Engineering Index 1956 p 1004.
Civil engineering works for power plant at Beautor
Report on completion of foundation works and construction of plant buildings; use of piles of 420, 560, 1,060 and 1,550 mm diam; rotation and percussion borings; "inverse circulation" method; total of 1080 piles used of 17.152 m total length. See Engineering Index 1956 p 1004.
Civil engineering works for power plant at Beautor
Centrale de Beautor
Alemany, B. (author)
Construction ; 13
1958
10 pages
Article (Journal)
French
© Metadata Copyright Elsevier B. V. All rights reserved.
Civil engineering works of Morcenx-Arjuzanx thermal power plant
Engineering Index Backfile | 1960
|Civil engineering works: buildings
British Library Conference Proceedings | 1993
|Civil engineering works: construction
British Library Conference Proceedings | 1993
|Civil engineering works: design
British Library Conference Proceedings | 1993
|British Library Conference Proceedings | 2004
|