A platform for research: civil engineering, architecture and urbanism
Removal of 192-ft span cast and wrought iron roof at London station described; trusses were dismantled with gantry; section of roof containing 600 tons of iron work was jacked up on to temporary track, and then hauled 300 ft to allow demolition to proceed.
Removal of 192-ft span cast and wrought iron roof at London station described; trusses were dismantled with gantry; section of roof containing 600 tons of iron work was jacked up on to temporary track, and then hauled 300 ft to allow demolition to proceed.
Demolition of cannon street station roof
Engineer
Holt, H.P. (author)
Engineer ; 207
1959
4 pages
Article (Journal)
English
© Metadata Copyright Elsevier B. V. All rights reserved.
Caisson craft: The ``wow'' factor at London's Cannon Street station
British Library Online Contents | 2009