A platform for research: civil engineering, architecture and urbanism
How modern piers save money
2,650,000 sq ft of new piers along two miles of Brooklyn, NY waterfront are of economical construction and will mean economical operation; use of densely placed low capacity timber piles carrying flat simple deck slab; 2,174,000 sq ft covered space is provided by light steel frame shed structures, covered with corrugated aluminum; 42 acres of paved upland area; rubber cushioned pile- and water-fenders; efficient cargo facilities.
How modern piers save money
2,650,000 sq ft of new piers along two miles of Brooklyn, NY waterfront are of economical construction and will mean economical operation; use of densely placed low capacity timber piles carrying flat simple deck slab; 2,174,000 sq ft covered space is provided by light steel frame shed structures, covered with corrugated aluminum; 42 acres of paved upland area; rubber cushioned pile- and water-fenders; efficient cargo facilities.
How modern piers save money
Eng News-Rec
Engineering News-Record ; 163
1959
3 pages
Article (Journal)
English
© Metadata Copyright Elsevier B. V. All rights reserved.
New deep piers save old bridge
Engineering Index Backfile | 1948
|Drill holes save digging for bridge piers
Engineering Index Backfile | 1965
New piers for railway bridge save $1,400,000
Engineering Index Backfile | 1947
|British Library Online Contents | 2008
Modern Hydronics: Save time, money separating hydronic circuits
British Library Online Contents | 2008