A platform for research: civil engineering, architecture and urbanism
Explanation of rigging and operation of cableway used in construction of rock weir in main river channel; towers 150 ft high have span of 2600 ft; normal sag of cable 130 ft; construction of artificial island with causeway. Before Am Soc Civ Engrs and Eng Inst Canada.
Explanation of rigging and operation of cableway used in construction of rock weir in main river channel; towers 150 ft high have span of 2600 ft; normal sag of cable 130 ft; construction of artificial island with causeway. Before Am Soc Civ Engrs and Eng Inst Canada.
Flow diversion at Niagara Falls
Civ Eng (NY)
Woods, H.C. (author)
1943
4 pages
Article (Journal)
English
© Metadata Copyright Elsevier B. V. All rights reserved.
Flow diversion at Niagara Falls
Engineering Index Backfile | 1943
|Flow diversion at Niagara Falls
Engineering Index Backfile | 1943
|Niagara Falls Intake Tunnel, City of Niagara Falls, New York
British Library Conference Proceedings | 1997
|Online Contents | 1994
|Engineering Index Backfile | 1913