A platform for research: civil engineering, architecture and urbanism
Historical notes on planning and construction of water supply tunnel on Island of Samos, begun about 540 BC and completed in about 15 yr; tunnel was designed by Eupalinos, son of Naustrophus; survey data; it is 3300 ft long and original bore was 8×8 ft in section; other works of Eupalinos are mentioned.
Historical notes on planning and construction of water supply tunnel on Island of Samos, begun about 540 BC and completed in about 15 yr; tunnel was designed by Eupalinos, son of Naustrophus; survey data; it is 3300 ft long and original bore was 8×8 ft in section; other works of Eupalinos are mentioned.
Eupalinos -- First civil engineer
Compressed Air Mag
Bichowsky, F.R. (author)
1943
5 pages
Article (Journal)
English
© Metadata Copyright Elsevier B. V. All rights reserved.
Civil Engineer - the `People's Engineer'
British Library Online Contents | 2012
TIBKAT | 1.1960 - 41.2004,2; damit Ersch. eingest.
Engineering Index Backfile | 1928
|TIBKAT | 13.1961 - 14.1962,3
Engineering Index Backfile | 1940
|