A platform for research: civil engineering, architecture and urbanism
Timber arches for blimp dock erected from Scaffold on flatcars
In contrast with methods used at Lakehurst docks, timber arches of 237-ft span at West Coast naval air station were erected from huge timber scaffold carried on 18 flatcars arranged on 6 parallel railroad tracks; progress was 50 ft per working day; tracks were used to take scaffold to second location. (See also Eng News-Rec v 131 n 9 Aug 26 1943 p 320-3)
Timber arches for blimp dock erected from Scaffold on flatcars
In contrast with methods used at Lakehurst docks, timber arches of 237-ft span at West Coast naval air station were erected from huge timber scaffold carried on 18 flatcars arranged on 6 parallel railroad tracks; progress was 50 ft per working day; tracks were used to take scaffold to second location. (See also Eng News-Rec v 131 n 9 Aug 26 1943 p 320-3)
Timber arches for blimp dock erected from Scaffold on flatcars
Western Construction News
1943
4 pages
Article (Journal)
English
© Metadata Copyright Elsevier B. V. All rights reserved.
Timber arches for blimp dock erected from Scaffold on flatcars
Engineering Index Backfile | 1943
Timber blimp dock arches erected from traveler set speed record
Engineering Index Backfile | 1944
Huge timber arches for navy blimp hangar erected by tower derricks
Engineering Index Backfile | 1943
Two timber blimp docks erected with traveling timber scaffolds
Engineering Index Backfile | 1943
Timber hangar erected from 16-story scaffold
Engineering Index Backfile | 1944
|