A platform for research: civil engineering, architecture and urbanism
Unreinforced concrete culvert design adapted to build airfield storm sewer
Development, illustrating war time trend to adaptation of existing designs for saving of critical materials, reported by Portland Cement Assn; standard design for unreinforced concrete culverts of Tennessee Dept of Highways and Public Works was adapted to construction of 2500-ft long storm sewer that drains air field at U S naval reserve aviation base being built in that state.
Unreinforced concrete culvert design adapted to build airfield storm sewer
Development, illustrating war time trend to adaptation of existing designs for saving of critical materials, reported by Portland Cement Assn; standard design for unreinforced concrete culverts of Tennessee Dept of Highways and Public Works was adapted to construction of 2500-ft long storm sewer that drains air field at U S naval reserve aviation base being built in that state.
Unreinforced concrete culvert design adapted to build airfield storm sewer
Eng Contract Rec
1943
2 pages
Article (Journal)
English
© Metadata Copyright Elsevier B. V. All rights reserved.
Some features of sewer and culvert design
Engineering Index Backfile | 1936
|Properties of reinforced concrete elliptical sewer and culvert pipe
Engineering Index Backfile | 1965
|Structural characteristics of reinforced concrete elliptical sewer and culvert pipe
Engineering Index Backfile | 1964
|Engineering Index Backfile | 1929
|