A platform for research: civil engineering, architecture and urbanism
One solution for lack of iron
Brief illustrated description of bridge over Tocuy River at km 302.080 of Riohacha- La Paz-Chiriguana road (Eastern trunk highway); wooden truss in two 10-m spans, resting on concrete abutments and central pier supported on guayacan (lignum vitae) piles; bill of materials includes 14 guayacan beams, each 11.20 m by 0.35 m by 0.25 m; total cost $1267.60 Colombian currency.
One solution for lack of iron
Brief illustrated description of bridge over Tocuy River at km 302.080 of Riohacha- La Paz-Chiriguana road (Eastern trunk highway); wooden truss in two 10-m spans, resting on concrete abutments and central pier supported on guayacan (lignum vitae) piles; bill of materials includes 14 guayacan beams, each 11.20 m by 0.35 m by 0.25 m; total cost $1267.60 Colombian currency.
One solution for lack of iron
Una Solucion Para la Falta de Hierro
Anales de Ingenieria ; 51
1943
5 pages
Article (Journal)
Spanish
© Metadata Copyright Elsevier B. V. All rights reserved.
Lack power? We are your solution!
Online Contents | 2006
Lack power? We are your solution!
Online Contents | 2005
British Library Online Contents | 1994
|Online Contents | 1994
Local modeling as a solution to the lack of stop-level ridership data
Elsevier | 2023
|