A platform for research: civil engineering, architecture and urbanism
Building timber truss bridge on Alaska highway
Bridge with total length of 584 ft built in 23 weeks, large part of time at sub-zero temperature, using material trucked 60 to 164 mi; constructional details.
Building timber truss bridge on Alaska highway
Bridge with total length of 584 ft built in 23 weeks, large part of time at sub-zero temperature, using material trucked 60 to 164 mi; constructional details.
Building timber truss bridge on Alaska highway
Pub Works
Public Works ; 74
1943
3 pages
Article (Journal)
English
© Metadata Copyright Elsevier B. V. All rights reserved.
Erecting timber-truss highway bridge in B.C. with D.P.W. forces
Engineering Index Backfile | 1953
|Structural Performance of Large Timber King Post Truss Highway Bridge
British Library Conference Proceedings | 2010
|Mono-truss welded highway bridge
Engineering Index Backfile | 1951
|Creosoted Douglas fir highway bridge with Howe timber truss embodies unique details of construction
Engineering Index Backfile | 1929
Alaska highway bridge of treated timber erected despite flow of Ice-Laden River
Engineering Index Backfile | 1944
|