A platform for research: civil engineering, architecture and urbanism
Building Peace River suspension bridge in sub-zero weather
To carry Alaska Highway over Peace River, near Taylor Flats, B C, Public Roads Administration built 930-ft span bridge in sub-zero weather, erecting towers entirely from ice in river; manner in which work was accomplished. (See also Pub Works v 74 n 8 Aug 1943 p 24, 26; Western Construction News v 18 n 8 Aug 1943 p 349-50; Pac Bldr and Engr v 49 n 9 Sept 1943 p 36-7)
Building Peace River suspension bridge in sub-zero weather
To carry Alaska Highway over Peace River, near Taylor Flats, B C, Public Roads Administration built 930-ft span bridge in sub-zero weather, erecting towers entirely from ice in river; manner in which work was accomplished. (See also Pub Works v 74 n 8 Aug 1943 p 24, 26; Western Construction News v 18 n 8 Aug 1943 p 349-50; Pac Bldr and Engr v 49 n 9 Sept 1943 p 36-7)
Building Peace River suspension bridge in sub-zero weather
Eng Contract Rec
Archibald, R. (author)
1943
Article (Journal)
English
© Metadata Copyright Elsevier B. V. All rights reserved.
Building Peace River suspension bridge in sub-zero weather
Engineering Index Backfile | 1943
|Building Peace River suspension bridge in sub-zero weather
Engineering Index Backfile | 1943
|Building Peace River suspension bridge in sub-zero weather
Engineering Index Backfile | 1943
|Engineering Index Backfile | 1944
British Library Conference Proceedings | 1993
|