A platform for research: civil engineering, architecture and urbanism
Highway over dam rebuilt in winter
In temperatures ranging to 35 C below zero old 10-ft highway bridge across Jackson Lake dam in Wyoming was replaced by 20-ft concrete bridge, requiring alteration of gate piers and machinery; sections of job were completely housed inside structure made up of working platform, forms and canvas shed.
Highway over dam rebuilt in winter
In temperatures ranging to 35 C below zero old 10-ft highway bridge across Jackson Lake dam in Wyoming was replaced by 20-ft concrete bridge, requiring alteration of gate piers and machinery; sections of job were completely housed inside structure made up of working platform, forms and canvas shed.
Highway over dam rebuilt in winter
Eng News-Rec
Engineering News-Record ; 130
1943
3 pages
Article (Journal)
English
© Metadata Copyright Elsevier B. V. All rights reserved.
Online Contents | 2002
Springfield-Holyoke road rebuilt as divided highway
Engineering Index Backfile | 1944
Gulf Coast road being rebuilt as dual highway
Engineering Index Backfile | 1940
Unclogging an Urban Artery - Chicago's busiest highway is rebuilt with surgical precision
Online Contents | 2007
TIBKAT | 1997
|