A platform for research: civil engineering, architecture and urbanism
Work was carried out in three stages consisting of building of lock inside 550 m long sheet pile cofferdam, building of downstream outer harbor inside second 300 m long cofferdam after recovery of part of first enclosure, and building of upstream harbor in open water from sheet piles used in first two stages; difficulties posed by nearness of old lock kept in service and to necessity of carrying out works in successive stages are discussed.
Work was carried out in three stages consisting of building of lock inside 550 m long sheet pile cofferdam, building of downstream outer harbor inside second 300 m long cofferdam after recovery of part of first enclosure, and building of upstream harbor in open water from sheet piles used in first two stages; difficulties posed by nearness of old lock kept in service and to necessity of carrying out works in successive stages are discussed.
Building of Orne lock
Construction de l'ecluse de l'Orne
Roussey, M. (author)
1965
6 pages
Article (Journal)
English
© Metadata Copyright Elsevier B. V. All rights reserved.
DataCite | 1899
Building Types Study 778 - Fashion Show, Las Vegas - Orne + Associates
Online Contents | 1999
Fashion Show, Las Vegas: Orne + Associates
British Library Online Contents | 1999
Voyage Aux Ruines De Babylone : Orné De Six Gravures
UB Braunschweig | 1818
|