A platform for research: civil engineering, architecture and urbanism
Bridge over Lech river near Kaufering
New superstructure of two-track railway bridge was built as continuous box-type girder with 2×57.4 m spans; design, fabrication, transportation, and assembly of two 43.0 m and one 29.4 m long girders, 320 cm wide, 353 cm high, is described; assembled superstructure was rolled into position over old framework using existing rail track and specially constructed trucks.
Bridge over Lech river near Kaufering
New superstructure of two-track railway bridge was built as continuous box-type girder with 2×57.4 m spans; design, fabrication, transportation, and assembly of two 43.0 m and one 29.4 m long girders, 320 cm wide, 353 cm high, is described; assembled superstructure was rolled into position over old framework using existing rail track and specially constructed trucks.
Bridge over Lech river near Kaufering
Die Lechbruecke bei Kaufering
Braeunlein, G. (author) / Mueller, A. (author)
Stahlbau ; 35
1966
7 pages
Article (Journal)
German
© Metadata Copyright Elsevier B. V. All rights reserved.
The bridge over the River Lech at Hochzoll
Engineering Index Backfile | 1926
|Plate girder railroad bridge over Lech River at Rain
Engineering Index Backfile | 1956
|New highway bridge over the lech at hochzoll near augsburg
Engineering Index Backfile | 1929
|British Library Online Contents | 1997
|