A platform for research: civil engineering, architecture and urbanism
Superstructure of composite construction three-span bridge (85.5-106.5-85.5 m) is formed by two parallel 4.21 m high steel plate girders 5.90 m apart, stiffened with cross and diagonal pieces; all three spans were prefabricated on one river bank, and shoved over piers with help of 21 m long launching nose and system of rollers; prefabricated 24 cm thick prestressed bridge deck slabs. each weighing 15 tons, were laid out with help of fork lift truck; slip form was used to construct 50 m high piers.
Superstructure of composite construction three-span bridge (85.5-106.5-85.5 m) is formed by two parallel 4.21 m high steel plate girders 5.90 m apart, stiffened with cross and diagonal pieces; all three spans were prefabricated on one river bank, and shoved over piers with help of 21 m long launching nose and system of rollers; prefabricated 24 cm thick prestressed bridge deck slabs. each weighing 15 tons, were laid out with help of fork lift truck; slip form was used to construct 50 m high piers.
Highway bridge over Saane river near Freiburg
Die Autobahnbruecke ueber die Saane bei Freiburg
1966
13 pages
Article (Journal)
German
© Metadata Copyright Elsevier B. V. All rights reserved.